Print as a poster
The plan is enlarged over several A4 sheets to tape together.
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
Cabling:
Cabling
- 0-CTRL PITCH OUT to Strega 1V/OCT
- 0-CTRL PRESSURE OUT to Strega ACTIVATION CV IN
Notes
Play with the 0-CTRL, and set its Pitch steps to taste. The 0-CTRL's knobs are not set on the drawing: they stand at their default position.
Source: Strega manual (Make Noise), Patch Corner, page 23. Patch by Tony Rolando.
Versions
1- v0 2026-10-04 10:19 CURRENT